Owner: CM LNG · 2024–2026
Cai Mep – Phu My Gas Pipeline & Distribution Station
A 2.0 MTPA LNG project. H2 Global supplied nearly 1,000 manual valves, all SDV and BDV valves and the complete E&I cable package; supplied, installed, hooked up, calibrated, loop-checked, pre-commissioned and commissioned all field instruments; and delivered the ICSS, ESD and CCTV systems. The facility has been handed over and is in operation.
- ICSS supply & implementation
- Emergency Shutdown System (ESD)
- CCTV system
- E&I installation, hook-up, function test and loop test
- Nearly 1,000 manual valves (L&T)
- Complete E&I and fibre optic cable supply
- Complete supply of SDV and BDV valves
- Supply, installation, hook-up, calibration, loop checking, pre-commissioning and commissioning of all field instruments